Bell Furnace Modernization and Spare Parts

Bell Furnace Modernization and Spare Parts

For installed imported all-hydrogen bell furnaces such as LOI (Germany) and EBNER (Austria), Hengyuan supplies control-system upgrades, its own control software, heating hoods and other key spares, and additional bases. Hengyuan equipment is interchangeable with the original units, extending service life and raising output while keeping existing processes and operating practice.

LOI / EBNER lines · control upgrades · interchangeable spares
Bell-furnace shop, Angang Steel cold-rolling mill

References and intellectual property

Angang Steel cold-rolling mill No. 1
Control upgrade of 90 LOI all-hydrogen bell furnaces (2019)
Tianjin Decai Cold Rolled Sheet (Delong Steel)
25 new bell furnaces interchangeable with the existing LOI units (2021–2025)
Heating cycle
reduced from about 22 h to about 17 h per heating
Software copyrights
Reg. No. 5246049 (LOI V4.0); Reg. No. 12253221 (EBNER V1.0)

The upgrade scope is defined after a site survey.

Process and engineering notes

Many bell-furnace lines imported years ago now run on obsolete controls, with long lead times and high prices for spares. Hengyuan knows the design and process logic of LOI, EBNER and other leading bell furnaces and can upgrade them without changing the base foundations or operating practice.

Improved combustion and heat-transfer design lets upgraded heating hoods shorten the heating cycle noticeably and raise the output of the whole line.

Applications

Control renewal, capacity increase and local spare-part supply for installed LOI, EBNER and similar all-hydrogen bell-furnace lines.

Engineering focus

  • PLC upgrades, for example Siemens S5 to S7, keeping existing processes and operator practice
  • Hengyuan's own registered control software: LOI All-Hydrogen Bell Furnace Control Software V4.0 and EBNER Bell Furnace Control Software V1.0
  • Heating hoods, inner covers and other spares interchangeable with the original equipment
  • New bases run alongside the existing line under common scheduling
  • Work carried out base by base to keep production disruption to a minimum

Scope of supply

Site survey, PLC and HMI upgrade, control software, heating/cooling hoods and inner covers as spares, complete new bell furnaces, installation, commissioning and training.

RFQ DATA

Original make and year, number of bases, existing PLC/HMI, list of spares required, capacity target.

Related projects

Control upgrade of 90 LOI all-hydrogen bell furnaces

Angang Steel Co., Ltd., Cold Rolling Mill No. 1 · 2019

Part of Anshan Iron and Steel Group

Control upgrade of 90 LOI all-hydrogen bell furnaces

The mill operated 90 all-hydrogen bell furnaces originally supplied by LOI of Germany. In 2019 Hengyuan upgraded the controls from Siemens S5 to S7. Its newly developed Hengyuan LOI All-Hydrogen Bell Furnace Control Software V4.0 matches the existing equipment, and Hengyuan supplies heating hoods interchangeable with the LOI units.

  • 90 bases
  • S5 → S7
  • Hengyuan LOI software V4.0
25 new bell furnaces interchangeable with existing LOI units

Tianjin Decai Cold Rolled Sheet Co., Ltd. · 2021–2025

Part of Delong Steel Group

25 new bell furnaces interchangeable with existing LOI units

Hengyuan built 25 new bell furnaces in three phases between 2021 and 2025, fully interchangeable with the plant's existing LOI bell furnaces. Improved Hengyuan heating hoods cut the heating cycle from about 22 hours to about 17 hours, roughly 22% more heating capacity.

  • 25 furnaces · 3 phases
  • Interchangeable with LOI
  • Heating cycle 22 h → 17 h

Need detailed technical data?

For performance data, configuration proposals or reference-site visits, please contact the Hengyuan sales team.

Contact us